Two months is optimistic for completing all the inspections needed on the steam plants unless the work was being done 24/7 like we do for our refueling outages at ye olde nuclear plant. Even with proper layup, degradation of the piping and valves would be a particular concern. So would warping of the turbine shafts from being set in one position for so long without being on the turning gear every so often. We are on the verge of starting up our Unit 1 reactor after 20 years of layup. That main turbine needed lots of work which took a long time to complete.

But I do agree that there are many skilled craft out there who can do the work. Most of the industrialized world's electricity is supplied via steam turbines.